Rubber Mulch onto Tarmac
Macadam should be laid a minimum of 7 days before installing Rubber Mulch.
BUILD UP:
1. 40mm Mulch layer dependent on CFH.
2. 50mm Open Textured Binder Course Macadam AC10 or AC14.
3. 100-300mm MOT Type 1 dependent on Ground Conditions
4. Geotextile Layer
5. Soil
EDGE OPTIONS:
Rubber, Concrete, Aluminium, Timber, Ramp Down or Chase Cut