Rubber-Gravel Mix onto Tarmac

Macadam should be laid a minimum of 7 days before installing Rubber-Gravel Mix.

BUILD UP:
1. 25-50mm Rubber-Gravel Mix
2. 50mm AC14 Open Texture Binder Course Macadam
3. 100-300mm MOT Type 1 dependent on Ground Conditions
4. Geotextile

EDGE OPTIONS:
Rubber, Concrete, Aluminium or Timber

Category: