Wetpour Mound

Mounds are shaped using MOT Type 1 Stone. This is capped with concrete to
prevent the structure from moving during play.

BUILD UP:
1. Min 15mm EPDM Wearing Course
2. 25mm SBR Base Course
3. Mound Capped with Concrete
4. Min 100mm MOT Type 1 Dependent on Ground Conditions
4. Geotextile Layer

Category:

Product Enquiry