Mounds are shaped using MOT Type 1 Stone. This is capped with concrete to prevent the structure from moving.
BUILD UP: 1. 25-50mm Rubber-Gravel Mix 2. Mound capped with concrete 3. Min 100mm MOT Type 1 dependent on Ground Conditions 4. Geotextile Layer 5. Soil
Call us on 01772 440340 or email us at
Privacy Policy | 01772 440340 | info@dcmsurfaces.com