Resin Bound Gravel onto Rubber-Gravel Mix

BUILD UP:

1. Min 20mm Resin Bound Gravel
2. Min 35mm Rubber-Gravel Mix
3. 100-300mm MOT Type 1 dependent on Ground Conditions
4. Geotextile
5. Soil

EDGE OPTIONS:
Rubber, Concrete, Aluminium or Timber

NOTE: A sealant gel can be applied to the top layer of the bound gravel if a non
porous surface is required. However, this will affect the warranty of the product
as the surface can become slippery in wet conditions or hold water if there are no
falls to nearby drainage facilities.

Product Enquiry