Type 4 Polymeric Structured Spray onto Tarmac

* Macadam should be laid a minimum of 7 days before installing polymeric surfaces.

BUILD UP:

  1. Line Markings
  2. 2-3mm of 0.5-1.5mm EPDM Rubber Granules (Structured Spray)
  3. 10-15mm of 1-3mm SBR Rubber Shockpad
  4. 50mm Open Textured Binder Course Macadam AC20/14
  5. 100-300mm MOT Type 1 Dependent on Ground Conditions
  6. Geotextile

    EDGE OPTIONS:

    Rubber, Concrete, Aluminium, Timber or Ramp Down

Category:

Product Enquiry