Bonded Gravel onto Tarmac

Macadam should be laid min 30 days before installing bonded gravel. As bonded
gravel is laid to 3mm, all deviations will show if the surface is not completely
leveled.

BUILD UP:
1. 3mm Resin Bonded Gravel
2. 25mm AC6 Dense Surface Course Macadam
3. 50mm AC 20/14 Dense Binder Course
4. 100-300mm MOT Type 1 dependent on Ground Conditions
5. Geotextile

EDGE OPTIONS:
Rubber, Concrete, Aluminium or Timber