Resin Bound Gravel onto Tarmac
Macadam should be laid a minimum of 7 days before installing Resin Bound Gravel.
BUILD UP:
1. 16-24mm Resin Bound Gravel
2. 50mm AC14 Open Texture Binder Course Macadam
3. 100-300mm MOT Type 1 dependent on Ground Conditions
4. Geotextile
EDGE OPTIONS:
Rubber, Concrete, Aluminium or Timber
NOTE: A sealant gel can be applied to the top layer of the bound gravel if a non
porous surface is required. However, this will affect the warranty of the product
as the surface can become slippery in wet conditions or hold water if there are no
falls to nearby drainage facilities.