Sudley Primary School
Project Background
Client: Sudley Primary School, Liverpool
Project Overview: Creation of a multi-functional, enriching outdoor environment for KS1 children, including sports, play, socialisation, quiet reading, and imaginative activities.
Surface Area: Over 1,000m² (various surfaces)
Installation Details
Sudley Primary School approached DCM to transform its outdoor environment into a dynamic and enriching space tailored to the needs of Key Stage 1 (KS1) children. The goal was to provide various zones that cater to sports, play, quiet reading, and imaginative activities, with equipment designed to support both growth and confidence-building challenges as the children develop.
DCM Surfaces was entrusted with the project, involving the excavation of existing areas, installation of new surfacing, MUGA fencing, and shelter to create an inclusive, functional, and visually appealing space.
The project began with the excavation of 480m² existing surfacing, followed by the installation of a geo-textile weed membrane and a compacted MOT Type 1 sub-base to ensure a stable foundation.
Tarmac Surfacing was applied for the Multi-Use Games Area (MUGA) base, along with a pathway that connects various playground areas, creating smooth transitions between activity zones.
Premium Surfacing Included:
– EcoMulch in sand, green, and blue, providing an eco-friendly, soft surface.
– Black EPDM sports surfacing with anti-slip spray, complete with a school logo for a high-quality, safe sports area.
– Vibrant Wetpour in light blue, green, red, purple, yellow, and pink, offering a colourful and engaging play surface.
Additionally, play equipment was specifically designed for KS1 children, encouraging both physical development and imaginative play. Shelters, shade sails, and a gazebo were added to create shaded areas for quiet activities and socialisation.
Testimonial
Outstanding service from start to finish. DCM have many key qualities that have contributed to a positive project at our school. Great work ethic, strong teamwork and responsiveness to our school needs. Beverley’s support, guidance and advice throughout the design stage and collaboration between different teams was exceptional. A big ‘Thank you’ to Dani, for your continued communication throughout the project keeping us informed at every stage and always being on hand for any queries’.