DCM Surfaces upgraded the pitch-side perimeter at Ewood Park for Blackburn Rovers, installing 800 m² of durable EPDM rubber in the club’s signature blue.
The installation team removed the old pitch-side surfacing in full and safely disposed of the material before laying the replacement.
The new blue finish runs along the pitch-side walkways and extends to the entrance of the players’ tunnel. It ties in with the stadium’s blue railings and seating, giving the perimeter a consistent finish.


Planning a pitch-side or stadium resurfacing project? Get in touch with DCM Surfaces to discuss your options.
