Early Education Centre – Wetpour Surfacing Installation

DCM Surfaces was appointed to transform the outdoor play space at Early Education Centre with a safe, vibrant, and long-lasting wetpour surface.

Project Details
Nearly 100m² of premium EPDM surfacing was installed in a mix of bright and natural tones to enhance safety while creating clearly defined spaces for different activities.

Client Testimonial
“We have used DCM Surfaces since 2013. All four of our nursery playgrounds were designed in collaboration with them, and installed by them. We recently extended one of our nursery playgrounds, and used DCM again. The person I liaised with was Dani Thomas. She took our design brief and some inspirations, and came back with a great design! Dani was a pleasure to communicate with, and very helpful with the technical details I needed to provide to the builder who did the groundwork. I am so pleased with the installation, and more importantly, children and their families love the extension of our garden. Well done again DCM Surfaces!!”

Facebook
Twitter
LinkedIn