DCM Surfaces were invited to be part of the redevelopment of the running track at Sheepmount Stadium following extensive damage caused by Storm Desmond in December 2015.
The entire surface of the eight lane, 400 metre track was completely resurfaced with Polymeric Structure Spray to create an IAAF tested porous system for year-round use.