Whalley Primary School

DCM Surfaces were thrilled to be awarded the contract to construct this new build MUGA, following a lengthy tender process.

The project included all elements of the build including; excavation of the existing surface, the MOT stone build up, macadam subbase, PCC edges and 1.8m twin rebound wire fence panels around the perimeter.

A 12-15mm of black EPDM was installed direct to the tarmac subbase, and then sprayed with an anti-slip coating.

Coloured line markings were added following the install, to enable multiple games such as; football, netball and basketball to be played.