Following a rigorous and competitive tender process, DCM Surfaces is delighted to have been appointed to deliver this state-of-the-art MUGA construction.
The project included all elements of the build including; excavation of the existing surface, the MOT stone build up, macadam subbase, PCC edges and 1.8m twin rebound wire fence panels around the perimeter.
A 12-15mm of black EPDM was installed direct to the tarmac subbase, and then sprayed with an anti-slip coating.